Developments in Geology, Exploration and Production at the Mt Gordon Copper Mine
Anthony
M Hespe
Western
Metals Ltd
Gunpowder
now called Mount Gordon will be a familiar name to those who have worked in
the mining industry in Queensland. It has a history of intermittent copper
production, attempts at novel treatment processes and periods of closure dating
back to the 1920s. Recent developments in geology, exploration and production,
which have transformed the economics of the deposit, are the subject of this
presentation.
Location
and Ownership
The
Mt Gordon Cu Mine is located 130 road km north of Mount Isa, Queensland at
latitude 190 20 S, longitude 1390 22 E on the
Camooweal (SE 54-13) 1:250,000 scale map sheet. The Mount Gordon Operation is
owned by Western Metals Ltd.
Current
Production and Resources/Reserves
Current
ore production is from an open cut on the Esperanza ore body at a maximum rate
of 750,000 tpa. All previous production was from an underground mine on the
Mammoth ore body. Production from Mammoth is suspended and will resume as mining
at Esperanza is completed.
Ore
is processed through a novel autoclave leach process to produce 45,000 tpa of
cathode copper by SX/EW.
Resources/reserves at 31 December 1999 are shown in Figure 1. Reserves at Esperanza are sufficient for an 8-year mine life with a further 2 years reserves at Mammoth. Resources should extend the life of the operation to 15 years.

Figure
1. Location of the Mount Gordon ore bodies, resources and ore reserves
Geology
and Mineralisation
Richardson
and Moy (1998) recently updated the geology and mineralisation of the Mt Gordon
Copper deposits.
The
pyrite/chalcocite/chalcopyrite ore bodies at Mammoth, Esperanza and Esperanza
South, are localised in brittle breccia and replacement zones associated with a
series of interconnected faults. The faults are related to the Mt Gordon Fault, a
regional scale NE trending transpressional dextral strike slip system. Movement
on the Mt Gordon Fault occurred in the later stages of the Isan Orogeny (1590
1500Ma). Brittle quartzites of the Whitworth Quartzite (~1740Ma) host
mineralisation at Mammoth. Esperanza and Esperanza South are hosted by
carbonaceous shales of the Esperanza Formation (~ 1650Ma).
Despite
the contrasting appearance of hypogene mineralisation due to the different
hosts, each ore body shows a progression from early silicification to two
generations of pyrite and then to introduction of copper species which in part
replace pyrite. At Esperanza, sulphides show large-scale replacement of host
rocks to form a massive sulphide zone 60 m wide. At Mammoth, sulphide
mineralisation is confined to veins and breccia zones but shows some host rock
replacement as well. Chlorite, haematite and K feldspar alteration are referred
to in the literature on the deposits. These forms of alteration are not well
defined and are part of the subject of current PhD research (Clark, in prep.).
The
economics of the Mt Gordon Operations are dominated by the occurrence of copper
as various leachable species of the chalcocite group. There is strong evidence
for a supergene origin for chalcocite in the Esperanza ore body. At Mammoth
there is evidence for complex overprinting of hypogene copper sulphides by
supergene copper sulphides. Hypogene chalcocite is found to 900 m below surface.
Ar/Ar
dating of manganese oxides from the ironstone overlying Esperanza indicate two
weathering events at 23Ma to 15Ma and around 3Ma which are related to the
supergene enrichment process (Briese, 1998).
Exploration/Development
and Production history to 1996
The
scope of recent changes at Mt Gordon is better appreciated with an understanding
of the exploration/development and production history which is summarised below
(see also Brock et al., 1998).
1923
1969
The
Shah brothers discovered copper and a lease was pegged at Mammoth in 1927. Small
operators produced a total of 7000 tonnes copper in high-grade ore from shallow
workings on the Mammoth No 1 ore body. There are no workings or production from
Esperanza for this period. The Esperanza leases were pegged in 1960s by Morrison
and others.
1969
1977
First
company scale development, initially by VAM, and then by a consortium of
Consolidated Goldfields Ltd and Mitsubishi Ltd. They produced a total of 50,000
tonnes of copper by treatment of Mammoth ore to produce a flotation concentrate.
Copper in concentrate production ranged from 4000 to 11000 tpa. The Mammoth mine
reached 500 m below surface. An exploratory decline to Esperanza in 1972 was
abandoned before reaching the ore body. Diamond drilling intersected Mammoth to
600 m, Esperanza to 350 m and Esperanza South to 200 m below surface.
1978
1982
Renison
Goldfields Consolidated Ltd experimented with heap leaching and in-situ leaching
of Mammoth ore to produce copper cement and copper cathode by SXEW, and 4500
tonnes of copper were produced. In 1982 Renison decided not to proceed, sold the
plant, and the property was closed.
1983
1988
Operation
suspended
1989
1996
Adelaide
Brighton Cement Ltd. purchased the property. They developed an in-situ leach
operation in the
Mammoth
mine to produce cathode copper through an SX/EW plant rated at 7500 tpa, later
expanded to 14,000 tpa. They extended underground development to 600 m below
surface (4720RL) for leaching stopes. High operating costs with the in-situ
leaching process prompted the establishment of surface heap leaching using
Mammoth ore. Operating costs could not be reduced and Adelaide Brighton decided
to sell the operation. Total copper production was 44,000 tonnes at an average
of 6000 tpa. Drilling at Esperanza and Mammoth continued. E lens was intersected
below the Mammoth workings at around 1000 m below surface.
By
1996 the status of the property can be summarised as:
Mammoth mineralisation was known by drilling to exist to 1000 m below surface and by development to 600 m below surface.
The
Esperanza deposit was known by drilling to exist to 350 m below surface but
very poorly defined from surface to 150 m below surface.
Ore reserves were only 1.2Mt at 3.6% Cu, all at Mammoth. (Adelaide Brighton Annual Report 1995).
Copper concentrate production and copper cathode production from in-situ leaching and surface heap leaching, all based on Mammoth ore, had proven uneconomic.
Production never exceeded 11,000 tonnes copper per year.
Exploration/Development
1996 2000
Aberfoyle
purchased the Mt Gordon Operation from Adelaide Brighton in June 1996. Western
Metals Ltd gained control of the operation by takeover of Aberfoyle in 1998.
There was an urgent need to increase reserves so that copper output could be
lifted from the low levels, which had contributed to previous uneconomic
production. Drilling commenced immediately.
At
Esperanza previous owners had defined a chalcocite resource of 3.3Mt at 6.2% Cu
(Adelaide Brighton Annual Report 1995). The resource was poorly defined from
surface down to 150 m (5150RL) due to very bad drilling conditions in what now
is interpreted as a supergene leached silica cap. The ore zone shape was
interpreted as a 20 m zone parallel to the Mammoth Extended Fault from 5200RL to
4950RL. Underground mining would be necessary for this zone. The 1972
exploration adit indicated bad ground conditions and high water flows around the
ore zone.
Aberfoyle
commenced testing the upper 150 m of Esperanza. After overcoming atrocious
drilling conditions in the chert cap the first holes returned spectacular
chalcocite intersections over a much wider zone than expected including:
SD279
65.7m at 12.2% Cu
SD280
49.5m at 9.5% Cu
Previous
drilling was abandoned in the silica cap metres short of this mineralisation.
Subsequent drilling defined a total chalcocite ore reserve of 4.2Mt at 7.1% Cu
located above 5100RL (Aberfoyle Annual Report 1997).
This
drilling program transformed the potential of the project. It:
defined a reserve of 300,000 tonnes of leachable copper at high grade;
showed that the bulk of the mineralisation was shallower than previously interpreted;
allowed
for extraction by open cut with better recovery than would have been
possible with the anticipated bad ground conditions in an underground
operation.
While
drilling was underway at Esperanza, re-evaluation and digitizing of the drilling
database were undertaken to better visualize the complex geometry of the entire
ore system and define new exploration targets. An untested inflexion in the
Mammoth Fault was selected as a potential dilational zone. Drilling discovered
Mammoth 2 Lens, which has an inferred resource of 1.1Mt at 5.8% Cu as chalcocite
(WMT Dec 1998 quarterly SER). This lens is in a position and orientation
previously unexpected for the Mammoth mine.
The following table compares the changes to resources and reserves since 1995 for the complete ore system:
|
|
Cu
metal in resources |
Cu metal in
reserves |
|
Adelaide
Brighton 1995 Annual Report |
652,000
tonnes |
43,200
tonnes |
|
Western
Metals Dec 1999 Reserve Statement |
900
000 tonnes |
358
000 tonnes |
From
acquisition in 1996 a number of processing routes were assessed to increase
production and produce copper metal using the existing SXEW plant. These
included leaching, flotation and tank leaching by ferric sulphate, and bacterial
methods (Brock et al., 1998; Richmond, 1998).
Following
the discovery of the high-grade mineralisation at Esperanza it was clear that a
high recovery process was required and that, with an open cut now possible,
production could be significantly expanded. A low-pressure temperature autoclave
was designed by the companys metallurgical group for the leaching stage.
Pilot plant trials showed recoveries over 90% with residence times of four
hours. The SX/EW was expanded to 45,000 tpa of LME A grade copper. The use of an
autoclave treatment for copper sulphide ore coupled with SX/EW is a world first.
Construction was completed in late 1998. In 1999, as the plant was brought on line, 32,133 tonnes cathode copper were produced at a cash cost of US43.9 cents/lb. The target for 2000 is production of 44,000 tonnes at 91% recovery and cash cost of US35 cents/lb. The last year of production of the previous plant was 7832 tonnes of copper cathode at a cash cost of $US1.06/lb. (Brock et al., 1998).
From
the 1970s, when company scale operations began at Mt Gordon, the mine has never
realised its potential.
With
a review of existing data, and persistence in very bad drilling conditions, the
current owners were able to dramatically increase reserves and allow planning of
an open cut operation on a high grade orebody at Esperanza.
The
company was able to take full advantage of this success by developing in house a
novel processing system which maximises recovery, minimises leach times, and
produces high grade copper metal on site. This combination places Mt Gordon in
the lower cost quartile of copper producers.
Exploration
is continuing to prolong the life of the operation.
Briese,
M.L., 1998. Supergene Copper Ore and Regolith Genesis, Esperanza Mine,
Gunpowder, Northwest Queensland. Unpublished
BSc Honours Thesis, University of Queensland.
Brock,
J.G., Chomley, J.C. and Richmond, G.D., 1998. Copper Leaching at Gunpowder. Conference
Proceedings, AusIMM 98 the Mining Cycle. The Australian Institute of
Mining and Metallurgy, Melbourne:281-284.
Clark,
D., in prep. Geology, Geochemistry and Genesis of the Gunpowder Cu Deposit,
Queensland. PhD thesis in preparation,
University of Tasmania.
Richardson,
S.M. and Moy, A.D., 1998. Gunpowder Copper Deposits. In: Geology of Australian and Papua New Guinean Mineral Deposits, Eds:
D.A Berkman and D.H. Mackenzie. The Australian institute of Mining and
Metallurgy, Melbourne:743-752.
Richmond, G.D., 1998.
Novel Hydrometallurgical Process at Mount Gordon. Australian
Journal of Mining Conference,Adding Value to the Carpentaria Mineral Province. Mt Isa, 1998.
Received:
March 2000
Published: Jan 2001
AIG
Journal Paper 2001-02, Jan 2001
|
Click on the button to download an Adobe Acrobat format (pdf file) copy of this paper - 49 kb |